1 |
|
|
|
|
2025-10-01 20:30:16 |
|
0 |
0 |
2 |
|
|
|
|
2025-03-31 20:20:00 |
|
0 |
0 |
3 |
|
|
|
|
2025-01-31 10:28:04 |
|
0 |
0 |
4 |
|
|
|
|
2024-12-18 06:08:44 |
|
0 |
0 |
5 |
|
|
|
|
2024-12-02 10:55:38 |
|
0 |
0 |
6 |
|
|
|
|
2024-09-29 12:46:38 |
|
0 |
0 |
7 |
|
|
|
|
2024-01-06 16:28:26 |
|
0 |
0 |
8 |
|
|
|
|
2023-12-26 07:06:46 |
|
0 |
0 |
9 |
|
|
|
|
2023-12-19 06:42:07 |
|
0 |
0 |
10 |
|
|
|
|
2023-12-12 02:28:00 |
|
0 |
0 |
11 |
|
|
|
|
2023-12-02 19:30:39 |
|
0 |
0 |
12 |
|
|
|
|
2023-11-25 18:43:18 |
|
0 |
0 |
13 |
|
|
|
|
2023-11-18 02:17:49 |
|
0 |
0 |
14 |
|
|
|
|
2023-11-11 19:27:44 |
|
0 |
0 |
15 |
|
|
|
|
2023-11-06 13:29:19 |
|
0 |
0 |
16 |
|
|
|
|
2023-10-30 22:38:13 |
|
0 |
0 |
17 |
|
|
|
|
2023-10-22 17:25:56 |
|
0 |
0 |
18 |
|
|
|
|
2023-10-17 15:39:42 |
|
0 |
0 |
19 |
|
|
|
|
2023-10-10 19:04:18 |
|
0 |
0 |
20 |
|
|
|
|
2023-10-03 23:42:01 |
|
0 |
0 |
21 |
|
|
|
|
2023-09-20 07:38:13 |
|
0 |
0 |
22 |
|
|
|
|
2023-09-15 07:59:32 |
|
0 |
0 |
23 |
|
|
|
|
2023-09-08 08:18:30 |
|
0 |
0 |
24 |
|
|
|
|
2023-09-02 03:52:31 |
|
0 |
0 |
25 |
|
|
|
|
2023-08-25 16:24:36 |
|
0 |
0 |
26 |
|
|
|
|
2023-08-13 13:35:17 |
|
0 |
0 |
27 |
|
|
|
|
2023-08-07 05:59:51 |
|
0 |
0 |
28 |
|
|
|
|
2023-08-01 18:03:10 |
|
0 |
0 |
29 |
|
|
|
|
2023-07-26 22:17:46 |
|
0 |
0 |
30 |
|
|
|
|
2023-07-21 02:03:36 |
|
0 |
0 |
31 |
|
|
|
|
2023-07-15 20:24:30 |
|
0 |
0 |
32 |
|
|
|
|
2023-07-08 15:57:48 |
|
0 |
0 |
33 |
|
|
|
|
2023-06-14 13:41:16 |
|
0 |
0 |
34 |
|
|
|
|
2023-06-08 18:44:48 |
|
0 |
0 |
35 |
|
|
|
|
2023-06-01 17:35:18 |
|
0 |
0 |
36 |
|
|
|
|
2023-05-19 20:37:57 |
|
0 |
0 |
37 |
|
|
|
|
2023-05-06 03:38:09 |
|
0 |
0 |
38 |
|
|
|
|
2023-04-30 04:29:08 |
|
0 |
0 |
39 |
|
|
|
|
2023-04-25 01:32:06 |
|
0 |
0 |
40 |
|
|
|
|
2023-04-19 07:18:12 |
|
0 |
0 |
41 |
|
|
|
|
2023-04-13 11:55:56 |
|
0 |
0 |
42 |
|
|
|
|
2023-03-26 22:43:14 |
|
0 |
0 |
43 |
|
|
|
|
2023-03-19 12:22:57 |
|
0 |
0 |
44 |
|
|
|
|
2023-03-13 05:22:20 |
|
0 |
0 |
45 |
|
|
|
|
2023-02-26 11:08:24 |
|
0 |
0 |
46 |
|
|
|
|
2023-02-20 16:24:29 |
|
0 |
0 |
47 |
|
|
|
|
2023-02-07 19:29:38 |
|
0 |
0 |
48 |
|
|
|
|
2023-02-02 05:58:08 |
|
0 |
0 |
49 |
|
|
|
|
2023-01-27 16:23:34 |
|
0 |
0 |
50 |
|
|
|
|
2023-01-10 07:56:36 |
|
0 |
0 |
51 |
|
|
|
|
2022-12-27 21:46:59 |
|
0 |
0 |
52 |
|
|
|
|
2022-12-20 11:36:05 |
|
0 |
0 |
53 |
|
|
|
|
2022-12-13 13:29:59 |
|
0 |
0 |
54 |
|
|
|
|
2022-12-08 02:00:51 |
|
0 |
0 |
55 |
|
|
|
|
2022-11-30 18:26:08 |
|
0 |
0 |
56 |
|
|
|
|
2022-11-23 00:24:44 |
|
0 |
0 |
57 |
|
|
|
|
2022-11-14 05:57:03 |
|
0 |
0 |
58 |
|
|
|
|
2022-10-28 02:45:20 |
|
0 |
0 |
59 |
|
|
|
|
2022-10-21 06:20:09 |
|
0 |
0 |
60 |
|
|
|
|
2022-10-12 12:56:39 |
|
0 |
0 |
61 |
|
|
|
|
2022-10-05 14:39:42 |
|
0 |
0 |
62 |
|
|
|
|
2022-09-23 18:50:24 |
|
0 |
0 |
63 |
|
|
|
|
2022-09-15 14:41:35 |
|
0 |
0 |
64 |
|
|
|
|
2022-09-09 13:12:15 |
|
0 |
0 |
65 |
|
|
|
|
2022-09-02 00:21:56 |
|
0 |
0 |
66 |
|
|
|
|
2022-08-27 03:55:36 |
|
0 |
0 |
67 |
|
|
|
|
2022-08-20 04:36:25 |
|
0 |
0 |
68 |
|
|
|
|
2022-08-13 18:08:55 |
|
0 |
0 |
69 |
|
|
|
|
2022-08-07 09:15:33 |
|
0 |
0 |
70 |
|
|
|
|
2022-07-31 09:01:45 |
|
0 |
0 |
71 |
|
|
|
|
2022-07-25 22:45:57 |
|
0 |
0 |
72 |
|
|
|
|
2022-07-19 23:11:34 |
|
0 |
0 |
73 |
|
|
|
|
2022-07-14 04:17:33 |
|
0 |
0 |
74 |
|
|
|
|
2022-07-02 05:27:35 |
|
0 |
0 |
75 |
|
|
|
|
2022-06-26 21:29:38 |
|
0 |
0 |
76 |
|
|
|
|
2022-06-15 01:37:01 |
|
0 |
0 |
77 |
|
|
|
|
2022-06-05 09:22:56 |
|
0 |
0 |
78 |
|
|
|
|
2022-05-31 06:07:40 |
|
0 |
0 |
79 |
UBRBDA |
Construction and Installation of Hand Pump Borehole |
Jajuwal |
100 percent |
2022-03-30 14:55:39 |
S-RIV-137-S.84-VOL1E |
3218223 |
3218223 |
80 |
UBRBDA |
Construction and Installation of Hand Pump Borehole |
Toro |
100 percent |
2022-03-30 14:54:24 |
S-RIV-137-S.84-VOL1D |
3218223 |
3218223 |
81 |
UBRBDA |
Construction and Installation of Hand Pump Borehole |
Toro |
100 percent |
2022-03-30 14:53:22 |
S-RIV-137-S.84-VOL1C |
3218223 |
3218223 |
82 |
UBRBDA |
Construction and Installation of Hand Pump Borehole |
Magamagari |
100 percent |
2022-03-30 14:50:52 |
S-RIV-137-S.84-VOL1B |
3218223 |
3218223 |
83 |
UBRBDA |
Construction and Installation of Hand Pump Borehole |
Special School |
100 percent |
2022-03-30 14:49:01 |
S-RIV-137-S.84-VOL1A |
3218223 |
3218223 |
84 |
UBRBDA |
Construction and Installation of Hand Pump Borehole |
Rinji |
100 percent |
2022-03-30 14:46:38 |
S-RIV-137-S.84-VOL1 |
3218223 |
3218223 |
85 |
UBRBDA |
Drilling and installation of solar powered Boreholes and construction of Overhead tank |
Unguwan Baka Pindiga |
100 percent |
2022-03-28 15:05:08 |
S-RIV-137-S.175-VOl1 |
29854441.22 |
29854441.22 |
86 |
UBRBDA |
Drilling and installation of Solar powered Borehole and construction of 40m overhead tank |
Unguwan Baka Pindiga |
100 percent |
2022-03-28 14:51:13 |
20220328 034248 |
29854441.22 |
29854441.22 |
87 |
UBRBDA |
Contract for repairs of disfunctional Borehole at Jalingo /Yorro /Zing Federal Constituency |
Majidadi ward Jalingo |
100 |
2022-03-28 10:52:46 |
S-RIV-137-S.83-VOL1c |
15453885.56 |
15453885.56 |
88 |
UBRBDA |
Contract for repairs of disfunctional Borehole at Jalingo /Yorro /Zing Federal Constituency |
Majidadi ward Jalingo |
100 |
2022-03-28 10:41:45 |
S-RIV-137-S.83/VOL1b |
15453885.56 |
15453885.56 |
89 |
UBRBDA |
Drilling and installation of 3Nos hand pump Boreholes at Jalingo /Yorro /Zing, Federal Constituency, |
Sabon pegi Turaki B ward |
100 |
2022-03-17 16:35:59 |
S-RIV-137-S.123-VOL1c |
4450230 |
4450230 |
90 |
UBRBDA |
Drilling and installation of 3Nos hand pump Boreholes at Jalingo /Yorro /Zing, Federal Constituency, |
Angwa baraya Sarkin Dawaki |
100 |
2022-03-17 16:02:39 |
S-RIV-137-S.123-VOL1b |
4450230 |
4450230 |
91 |
UBRBDA |
Drilling and installation of 3Nos hand pump Boreholes at Jalingo /Yorro /Zing, Federal Constituency, |
Tipper Backs |
100 |
2022-03-17 15:24:34 |
S-RIV-137-S.123-VOL1a |
4450230 |
4450230 |
92 |
UBRBDA |
Rehabilitation of disfunctional Borehole at Jalingo Yorro federal Constituency Taraba State |
, Zing |
100 |
2022-03-17 13:44:19 |
S-RIV-137-S.83-VOL1a |
15453885.56 |
15453885.56 |
93 |
UBRBDA |
Rehabilitation of disfunctional Borehole at Jalingo Yorro federal Constituency Taraba State |
Yorro Pantisawa |
100 |
2022-03-17 13:03:27 |
S-RIV-137-S.83-VOL1b |
15453885.56 |
15453885.56 |
94 |
yyyuujj |
vhhjjjjjjj |
hhhiii |
tghijkko |
2022-03-15 11:13:32 |
20220315 121236 |
0 |
0 |
95 |
FMSDIGA |
Procurement, Installation and Web Hosting of Monitoring & Evaluation apllication /Software Compo |
Federal Ministry Of Special Duties and IGA, bullet building, |
100 |
2022-03-11 17:58:18 |
FMSDIGA-PROC-CAP-2021-LOT-B7 |
5792632 |
5792632 |
96 |
OORBDA |
Skills acquisition and women empowerment in Alimosho Federal Constituency, Lagos State |
Alimosho |
100 |
2022-03-09 14:33:32 |
OORBDA-ADM-229-VOL.1-2021-048 |
33802340 |
33802340 |
97 |
UNRBDA |
Provision and supply of NPK and Urea Fertilizer for season Farming in FCT Senitorial District. |
Scc road Gwari |
100 |
2022-03-07 18:39:33 |
UNBA-239-S.131-VOL.1-1 |
90188907.25 |
90188907.25 |
98 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Tafa-Ijah Bagayi |
100 |
2022-02-22 13:31:10 |
UNBA-239-S.125-VOL.1-1a |
3979124 |
3979124 |
99 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Tungan Makama |
100 |
2022-02-22 13:29:23 |
UNBA-239-S.125-VOL.1-1b |
3979124 |
3979124 |
100 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Gauraka Zuma |
100 |
2022-02-22 13:24:52 |
UNBA-239-S.125-VOL.1-1c |
3979124 |
3979124 |
101 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Hayin Nasarawa |
100 |
2022-02-22 13:19:05 |
UNBA-239-S.125-VOL.1-1d |
3979124 |
3979124 |
102 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Kurmin Sarki Wards |
100 |
2022-02-22 13:16:44 |
UNBA-239-S.125-VOL.1-1e |
3979124 |
3979124 |
103 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Kurmin Sarki Wards |
100 |
2022-02-22 13:12:32 |
UNBA-239-S.125-VOL.1-1f |
3979124 |
3979124 |
104 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Kuchiko Maje Ward |
100 |
2022-02-22 13:10:42 |
UNBA-239-S.125-VOL.1-1g |
3979124 |
3979124 |
105 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Kwangila Minna Central |
100 |
2022-02-22 13:08:21 |
UNBA-239-S.125-VOL.1-1h |
3979124 |
3979124 |
106 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Makera |
100 |
2022-02-22 13:06:35 |
UNBA-239-S.125-VOL.1-1i |
3979124 |
3979124 |
107 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Kaffinkoro |
100 |
2022-02-22 13:04:37 |
UNBA-239-S.125-VOL.1-1r |
3979124 |
3979124 |
108 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Tuna |
100 |
2022-02-22 13:03:47 |
UNBA-239-S.125-VOL.1-1q |
3979124 |
3979124 |
109 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Gwamp Paikoro |
100 |
2022-02-22 13:03:09 |
UNBA-239-S.125-VOL.1-1p |
3979124 |
3979124 |
110 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Nikuchi Paikoro |
100 |
2022-02-22 13:02:14 |
UNBA-239-S.125-VOL.1-1o |
3979124 |
3979124 |
111 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Kwanayi Paikoro |
100 |
2022-02-22 13:00:47 |
UNBA-239-S.125-VOL.1-1n |
3979124 |
3979124 |
112 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Chanchaga Ward |
100 |
2022-02-22 12:58:51 |
UNBA-239-S.125-VOL.1-1m |
3979124 |
3979124 |
113 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Shanu Bosso Central |
100 |
2022-02-22 12:57:13 |
UNBA-239-S.125-VOL.1-1l |
3979124 |
3979124 |
114 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Prison Minna South |
100 |
2022-02-22 12:55:28 |
UNBA-239-S.125-VOL.1-1k |
3979124 |
3979124 |
115 |
UNRBDA |
Provision of 1No. Handpump Borehole in Niger Senatorial District |
Nasarawa A |
100 |
2022-02-22 12:53:11 |
UNBA-239-S.125-VOL.1-1j |
3979124 |
3979124 |
116 |
UNRBDA |
Contract for the Supply of TVS Motorcycles to Jibia/Kaita Federal Constituency, Kastina State |
Kastina |
100 |
2022-02-07 17:01:53 |
UNBA-239-S.126-VOL.1-1masuka |
39971248 |
39971248 |
117 |
UNRBDA |
Construction of 1No handpump Borehole in Niger East Senitorial District. |
GARATU |
100 |
2022-02-07 16:10:17 |
UNBA-239-S.126-VOL.1-1n |
1989562 |
1989562 |
118 |
UNRBDA |
Construction of 1No handpump Borehole in Niger East Senitorial District. |
ANGUWAN AMLIZHIBUI |
100 |
2022-02-07 16:07:39 |
UNBA-239-S.126-VOL.1-1m |
1989562 |
1989562 |
119 |
UNRBDA |
Construction of 1No handpump Borehole in Niger East Senitorial District. |
TALAWYI |
100 |
2022-02-07 16:03:43 |
UNBA-239-S.126-VOL.1-1l |
1989562 |
1989562 |
120 |
UNRBDA |
Construction of 1No handpump Borehole in Niger East Senitorial District. |
GWADA |
100 |
2022-02-07 15:59:31 |
UNBA-239-S.126-VOL.1-1k |
1989562 |
1989562 |
121 |
UNRBDA |
Construction of 1No handpump in Niger East Senitorial District |
Model Primary School Kuta |
100 |
2022-02-07 12:07:27 |
UNBA-239-S.126-VOL.1-1i |
1989562 |
1989562 |
122 |
UNRBDA |
Construction of 1No handpump in Niger East Senitorial District |
Malaraba Dan daudu |
100 |
2022-02-07 12:06:00 |
UNBA-239-S.126-VOL.1-1h |
1989562 |
1989562 |
123 |
UNRBDA |
Construction of 1No handpump in Niger East Senitorial District |
AP Primary School |
100 |
2022-02-07 12:04:51 |
UNBA-239-S.126-VOL.1-1g |
1989562 |
1989562 |
124 |
UNRBDA |
Construction of 1No handpump in Niger East Senitorial District |
DAGBEDO |
100 |
2022-02-07 12:03:12 |
UNBA-239-S.126-VOL.1-1f |
1989562 |
1989562 |
125 |
UNRBDA |
Construction of 1No handpump in Niger East Senitorial District |
Jimi |
100 |
2022-02-07 12:00:26 |
UNBA-239-S.126-VOL.1-1e |
1989562 |
1989562 |
126 |
UNRBDA |
Construction of 1No handpump in Niger East Senitorial District |
Anguwan Gwari |
100 |
2022-02-07 11:59:33 |
UNBA-239-S.126-VOL.1-1d |
1989562 |
1989562 |
127 |
UNRBDA |
Construction of 1No handpump in Niger East Senitorial District |
Zara |
100 |
2022-02-07 11:57:50 |
UNBA-239-S.126-VOL.1-1c |
1989562 |
1989562 |
128 |
UNRBDA |
Construction of 1No handpump in Niger East Senitorial District |
Kamace |
100 |
2022-02-07 11:56:40 |
UNBA-239-S.126-VOL.1-1b |
1989562 |
1989562 |
129 |
UNRBDA |
Construction of 1No handpump in Niger East Senitorial District |
Huyun Sakkwatawa |
100 |
2022-02-07 11:55:02 |
UNBA-239-S.126-VOL.1-1a |
1989562 |
1989562 |
130 |
UNRBDA |
Construction of 1No handpump in Niger East Senitorial District |
Anguwan Tabwere |
100 |
2022-02-07 11:52:26 |
UNBA-239-S.126-VOL.1-1j |
1989562 |
1989562 |
131 |
UNRBDA |
CONSTRUCTION OF 1NO SOLAR POWERED BOREHOLE IN FCT |
AMAC |
100% |
2022-01-27 10:23:52 |
UNBA.239-S.49-VOL.1-1 |
11999250 |
11999250 |
132 |
UNRBDA |
PROVISION AND INSTALLATION OF 2NO MOTORIZED BOREHOLES IN FCT |
AGYANA |
100% |
2022-01-27 10:14:17 |
UNBA.239-S.66-VOL.1-1b |
19458000 |
19458000 |
133 |
UNRBDA |
PROVISION AND INSTALLATION OF 2NO MOTORIZED BOREHOLES IN FCT |
PABEIYI |
100% |
2022-01-27 10:11:02 |
UNBA.239-S.66-VOL.1-1 |
19458000 |
19458000 |
134 |
UNRBDA |
PROVISION AND INSTALLATION OF 2NO MOTORIZED BOREHOLES IN FCT |
TUDUN FULANI |
100% |
2022-01-27 10:06:46 |
UNBA.239-S.67-VOL.1-1b |
19458000 |
19458000 |
135 |
UNRBDA |
PROVISION AND INSTALLATION OF 2NO MOTORIZED BOREHOLES IN FCT |
BUZUM KURE |
100% |
2022-01-27 10:03:43 |
UNBA.239-S.67-VOL.1-1 |
19458000 |
19458000 |
136 |
UNRBDA |
PROVISION AND INSTALLATION OF 1NO MOTORIZED BOREHOLE IN FCT |
TUNGA SAMU |
100% |
2022-01-27 09:57:44 |
UNBA.239-S.71-VOL.1-1 |
9729000 |
9729000 |
137 |
UNRBDA |
PROVISION OF BOREHOLES IN NIGER EAST SENATORIAL DISTRICT |
LAPAI LGA |
100% |
2022-01-27 08:26:19 |
UNBA.239-S.72-VOL. 1-1c |
9847810 |
9847810 |
138 |
UNRBDA |
PROVISION OF BOREHOLES IN NIGER EAST SENATORIAL DISTRICT |
PZ, CHANCHAGA LGA |
100% |
2022-01-27 07:52:02 |
UNBA.239-S.72-VOL.1-1b |
9847810 |
9847810 |
139 |
UNRBDA |
Provision of 5no. hand pump boreholes in Niger East Send.District |
FM Maitumbi, Bosso. |
100 |
2022-01-25 11:51:47 |
UNBA.239-S.72-VOL.1-1a |
9847810 |
9847810 |
140 |
UNRBDA |
Provision and installation of motorized Borehole in FCT |
Mpape |
100 |
2022-01-22 15:52:03 |
UNBA-239-S.69.VOL.1-1a |
9729000 |
9729000 |
141 |
UNRBDA |
Provision and installation of motorized Borehole in FCT |
Kurudu |
100 |
2022-01-22 15:48:32 |
UNBA-239-S.69.VOL.1-1b |
9729000 |
9729000 |
142 |
UNRBDA |
Provision & installation of 1No Motorized Borehole |
Zuba |
100 |
2022-01-21 16:36:17 |
UNBA-239-S.70-VOL.1-1 |
9729000 |
9729000 |
143 |
UNRBDA |
Rehabilitation of walkway and excavation of drainage |
Wuse , FCT Abuja |
100 |
2022-01-21 14:04:40 |
UNBA-239-S.124-VOL.1-1 |
28000000 |
28000000 |
144 |
UNRBDA |
Provision of Solar Street Light |
Wuse , FCT Abuja |
100 |
2022-01-21 14:01:18 |
UNBA-239-S.92-VOL.1-1 |
29643750 |
29643750 |
145 |
UNRBDA |
Rehabilitation of Junior Secondary school Wuse I FCT Abuja. |
Wuse Zone I, FCT Abuja |
100 |
2022-01-21 12:32:29 |
UNBA-239-S.123-VOL.1-1 |
27300000 |
27300000 |
146 |
UNRBDA |
Provision and installation of 2Nos Motorized Borehole in FCT Senitorial District |
Wasa |
100 |
2022-01-20 15:25:38 |
UNB-239-S.69-VOL.1b |
9700000 |
9700000 |
147 |
UNRBDA |
Provision and installation of 2Nos Motorized Borehole in FCT Senitorial District |
Kabusa |
100 |
2022-01-20 13:33:57 |
UNB-239-S.69-VOL.1a |
9700000 |
9700000 |
148 |
Federal Ministry Of Works |
Drilling of 2 Nos. Solar powered Motorized Borehole |
Gulumbe 11 |
100 |
2021-10-12 15:45:51 |
20211012164542 |
9106500 |
9106500 |
149 |
Federal Ministry Of Works |
Drilling of 2 Nos. Solar powered Motorized Borehole |
Gulumbe 1 |
100 |
2021-10-12 15:43:37 |
20211012164332 |
9106500 |
9106500 |
150 |
Federal Ministry Of Works |
Drilling of 2 Nos. Solar powered Motorized Borehole |
Sabon Gari Goru11 |
100 |
2021-10-12 15:30:15 |
20211012162952 |
9106500 |
9106500 |
151 |
Federal Ministry Of Works |
Drilling of 2 Nos. Solar powered Motorized Borehole |
Sabon Gari Goru1 |
100 |
2021-10-12 15:29:20 |
20211012161616 |
9106500 |
9106500 |
152 |
National Biosafety Management Agency (NBMA) |
Sensitization, Training and empowerment of youths and women in Hwale Federal Constituency |
Namado Event Center |
100 |
2021-10-07 10:39:22 |
20211007113908 |
20411082 |
20411082 |
153 |
BORBDA |
Construction of 5Nos Borehole in Communities |
Ibilo/Osu |
100 |
2021-05-24 17:13:23 |
BR/CR/1689 /VOLIII /20 /111 |
118183048 |
112313240 |
154 |
BORBDA |
Imokhide erosion control |
Igarra |
100 |
2021-05-05 12:27:27 |
BR/CR/1689/VOLIII/20/109 |
19999192 |
19111790 |
155 |
BORBDA |
Construction of Royal Hall |
Uneme-Akpama |
100 |
2021-05-05 12:22:55 |
BR/CR/1689/VOLIII/20/119 |
19997848 |
19154906 |
156 |
BORBDA |
Construction and equipping of 1 No Borehole |
AFASHIO Etsako |
100 |
2021-05-05 12:17:49 |
BR/CR/1689/VOLIII/20/104 |
9959617 |
9479911 |
157 |
BORBDA |
Re-Construction & re-novation of 1no 3 classrooms blocks |
Unemeerhurum |
100 |
2021-05-05 12:11:09 |
BR/CR/1689/VOLIII/20/066 |
25028334 |
23829492 |
158 |
BORBDA |
Re-Construction & re-habilitation of classroom blocks |
Ibiekuma |
100 |
2021-05-05 12:06:29 |
BR/CR/1689/VOLIII/20/073 |
29842682 |
18091404 |
159 |
BORBDA |
Construction & Furnishing of township hall |
Dagbala |
100 |
2021-05-05 12:00:55 |
BR/CR/1689/VOLIII/20/120 |
14846610 |
14162588 |
160 |
BORBDA |
Construction of ultra modern Palace |
Ekor |
100 |
2021-05-05 11:55:50 |
BR/CR/1689/VOLIII/20/113 |
24999734 |
23802280 |
161 |
BORBDA |
Provision of 3Nos motorized Boreholes |
Igarra, Ikiran-Oke & Aiyeteju |
100 |
2021-05-05 11:51:19 |
BR/CR/1689/VOLIII/20/105 |
27863114 |
26620798 |
162 |
BORBDA |
Construction of ultra modern Palace |
Ekpedo |
100 |
2021-05-05 11:44:26 |
BR/CR/1689/VOLIII/20/112 |
29842682 |
28660070 |
163 |
BORBDA |
Construction of roads @ Ibillo |
Ibilo Ekunyo-Ogugu road |
100 |
2021-05-05 11:35:36 |
BR/CR/1689/VOLIII/20/115 |
49906876 |
47699092 |
164 |
BORBDA |
Construction of UU-ESE Bridge |
UU-ESE |
100 |
2021-05-05 11:29:50 |
BR/CR/1689/VOLIII/20/114 |
34547328 |
33027024 |
165 |
BORBDA |
Renovation of Eleafe Primary School |
Ekpesa |
100 |
2021-05-05 11:24:45 |
BR/CR/1689/VOLIII/20/107 |
44973716 |
42903592 |
166 |
BORBDA |
Provision of 2Nos motorized Boreholes |
Kajola Street/Igara Community |
100 |
2021-05-05 11:19:22 |
BR/CR/1689/VOLIII/20/035 |
19874942 |
18793654 |
167 |
BORBDA |
Renovation of 2Nos 3 Classrooms |
Ekpesa |
100 |
2021-05-05 11:14:31 |
BR/CR/1689/VOLIII/20/122 |
23971474 |
22818752 |
168 |
BORBDA |
Provision of 2Nos Boreholes |
Anachoruru |
100 |
2021-05-05 11:09:15 |
BR/CR/1689/VOLIII/20/036 |
19674554 |
18793654 |
169 |
BORBDA |
Provision of 3Nos Boreholes |
Ibilo/Osu |
100 |
2021-05-05 11:05:40 |
BR/CR/1689/VOLIII/20/106 |
27353016 |
26136462 |
170 |
BORBDA |
Ogugu Erosion Control |
Ogugu |
100 |
2021-05-05 10:56:35 |
BR/CR/1689/VOLIII/20/110 |
19645936 |
18776692 |
171 |
BORBDA |
Construction of Bridge and grading of road; |
Atte/Eogbigbere |
100 |
2021-05-05 10:50:39 |
BR/CR/1689/VOLIII/20/108FNL |
33956304 |
32561056 |
172 |
BORBDA |
Renovation of Imoga Secondary School |
IMOGA |
100 |
2021-05-05 10:45:13 |
BR/CR/1689/VOLIII/20/108JGL |
36435172 |
34782572 |
173 |
BORBDA |
Construction & Furnishing of 200 seats capacity event center |
IGARRA |
100 |
2021-05-05 10:38:45 |
BR/CR/1689/VOLIII/20/116 |
99866456 |
95290544 |
174 |
UBRBDA |
Construction of handpump bore hole |
Pantisawa |
100 |
2021-02-25 14:35:22 |
20210225 153450Patio1 |
40000000 |
7696817 |
175 |
UBRBDA |
Construction of handpump bore hole |
Pantisawa |
100 |
2021-02-25 14:22:38 |
20210225 152141Patio2 |
40000000 |
7696817 |
176 |
UNRBDA |
Provision of Solar Street Light in |
Kwali |
100 |
2021-02-19 17:53:19 |
UNBA-238/S.136.VOL.1/1 |
94655080 |
94655080 |
177 |
UNRBDA |
Provision of motorized Borehole in FCT |
Upper Niger River Basin guest house, |
100 |
2021-02-13 14:16:38 |
UNBA -38/S.13/71-1 |
10000000 |
10000000 |
178 |
UNRBDA |
Provision of motorized Borehole in FCT |
Apo |
100 |
2021-02-13 11:48:43 |
UNBA-38/S.13/72-2 |
10000000 |
10000000 |
179 |
UNRBDA |
Provision of motorized Borehole in FCT |
Apo |
100 |
2021-02-13 10:19:14 |
UNBA-38/S.13/71 |
10000000 |
10000000 |
180 |
UNRBDA |
Construction of block of 3No class rooms |
Kaida Sabo |
75% |
2021-01-20 15:31:57 |
UNBA-238/S.133/VOL.1/1Rubbag2 |
41506968 |
41506968 |
181 |
UNRBDA |
Construction of 1 No Health care center |
Jeda/gudaba |
75% |
2021-01-20 13:56:24 |
UNBA-238/S.132/VOL.1/1DiscoveryC |
41506968 |
69315904 |
182 |
UNRBDA |
Construction of 3 sets of class |
Kuchiako |
75% |
2021-01-20 13:33:41 |
UNBA-238/S.135/VOL.1/1rubbag |
69315904 |
69315904 |
183 |
UNRBDA |
Construction of 3 sets of class |
Kuchiako |
75% |
2021-01-20 13:32:03 |
UNBA-238/S.135/VOL.1/1 |
69315904 |
69315904 |
184 |
UNRBDA |
Contract for rehabilitation of 4 Kilometers M, K Road in Minna, Chanchaga Lga Niger East Senitorial |
Chanchaga Niger |
100 |
2020-07-06 12:17:49 |
UNBA-237-S.129-VOLI-1 |
21000000 |
21000000 |
185 |
UNRBDA |
Contract for Construction of motorized Borehole in FCT Senitorial District FCT, Abuja |
Fct Senitorial District FCT Abuja |
100 |
2020-07-06 12:05:39 |
UNBA-237-S.122-VOLI-1 |
8000000 |
8000000 |
186 |
UNRBDA |
Contract for Supply of 4x4 Hilux Pickup Vehicle to Jega/Aliero/Gwandu Federal Constituency, Kebbi St |
Jega /Aliero /Gwandu |
100 |
2020-07-06 11:52:28 |
UNBA-237-S.159-VOLI-1 |
30206000 |
30206000 |
187 |
UNRBDA |
Contract for Construction of Gbamachi/Gbagan Bridge at Edati LGA, Lavun/Edati/Mokwa Federal Constitu |
Lavun/Edati/Mokwa |
100 |
2020-07-06 11:40:49 |
UNBA-237-S.NA1-VOLI-1 |
3520061.5 |
3520061.5 |
188 |
UNRBDA |
Contract for Electrification of Baban Gwari Community with 1No, 500kva Transformer in Lapi LGA, Nige |
Baban Gwari Community |
100 |
2020-07-06 11:32:17 |
UNBA-237-S.NA-VOLI-1 |
17765000 |
53000000 |
189 |
UNRBDA |
Contract for the renovation of Suleja water works in Suleja/Tafa/Gurara Federal Constituency Niger S |
Suleja/Tafa/Gurara Federal Const. |
100 |
2020-07-06 11:17:14 |
UNBA-237-S.105-VOLI-1 |
53000000 |
53000000 |
190 |
UNRBDA |
Contract for Construction of 1No Motorized in FCT Senitorial District |
Fct Abuja |
100 |
2020-07-04 15:38:52 |
UNBA-237-S.124-VOLI-1 |
8000000 |
8000000 |
191 |
UNRBDA |
Contract for the purchase of 2Nos. Coaster busses and 1No of Toyota Hiace 18 seater bus for FCT Sen |
Fct Abuja |
100 |
2020-07-04 14:32:55 |
UNBA-237-S.49-VOLI-1 |
74250000 |
74250000 |
192 |
UNRBDA |
Contract for the Supply of tractors to Jega/Aliero/Gwandu Federal Constituency, Kebbi State |
Jega/Aliero/Gwandu |
100 |
2020-07-04 14:14:36 |
UNBA-237-S.53-VOLI-1 |
47978000 |
47978000 |
193 |
NDLEA |
Contract for the Supply of Women Employment Materials to Shiroro, Otukpo LGA, Benue State |
SHIRORO OTUKPO |
100 |
2020-06-25 10:27:11 |
NDLEA-FIN-CONST-2019-33 |
49940000 |
14982000 |
194 |
NDLEA |
Contract for the Medical Outreach to Ipolo Ugboju, Otukpo LGA, Benue State |
Ipolo Ugboju OTUKPO |
100 |
2020-06-25 10:21:45 |
NDLEA-FIN-CONST-2019-31 |
49940000 |
14982000 |
195 |
NDLEA |
Contract for Advocacy and drug Abuse Education Programme in Ogobia, Otukpo LGA, Benue State |
OGOBIA OTUKPO |
100 |
2020-06-25 10:16:56 |
NDLEA-FIN-CONST-2019-30 |
49940000 |
14982000 |
196 |
NDLEA |
Contract for Advocacy and drug enlightenment campaign and education in Onaje Otukpo LGA, Benue State |
Onaje OTUKPO |
100 |
2020-06-25 10:12:05 |
NDLEA-FIN-CONST-2019-29 |
49940000 |
14982000 |
197 |
NDLEA |
Contract for sensitization advocacy and drug enlightenment in Iwili Adoka, Otukpo Lga, Benue State |
Iwili Adoka OTUKPO |
100 |
2020-06-25 10:05:19 |
NDLEA-FIN-CONST-2019-32 |
49940000 |
14982000 |
198 |
NDLEA |
Contract for enlightenment, sensitization and training of youths stratigic empowerment on skill acqu |
Okpafalo OTUKPO |
100 |
2020-06-25 09:51:09 |
NDLEA-FIN-CONST-2019-25 |
49940000 |
14982000 |
199 |
NDLEA |
Contract for the awareness/sensitization Programme on Danger and effects of the use of Hard Drugs in |
Aiya OTUKPO |
100 |
2020-06-25 09:44:03 |
NDLEA-FIN-CONST-2019-28 |
49940000 |
14982000 |
200 |
NDLEA |
Contract for the awareness/sensitization Programme on Danger and effects of the use of Hard Drugs in |
IFETE OTUKPO |
100 |
2020-06-25 09:39:25 |
NDLEA-FIN-CONST-2019-27 |
49940000 |
14982000 |
201 |
UNRBDA |
Contract for the supply of Sharon buses for youth empowerment in bade, Nguru, machina and Yusuffari |
bade, Nguru, machina and Yusuffari Yobe state |
100 |
2020-06-19 17:23:56 |
UNBA-237-S.51-VOLI-1 |
16000000 |
65120000 |
202 |
UNRBDA |
Contract for the construction of 1No motorized Borehole in FCT Senitorial District |
Gwagwalada, fct |
100 |
2020-06-19 17:19:40 |
UNBA-237-S.64-VOLI-1 |
16000000 |
8000000 |
203 |
UNRBDA |
Contract for the construction of 1No motorized Borehole in FCT Senitorial District |
Anka Village Abuja municipal area council |
100 |
2020-06-19 17:16:02 |
UNBA-237-S.65-VOLI-1 |
8000000 |
8000000 |
204 |
UNRBDA |
Contract for the construction of 1No motorized Borehole in FCT Senitorial District |
Anka Village Abuja municipal area council |
100 |
2020-06-19 17:09:42 |
UNBA-237-S.72-VOLI-1 |
16000000 |
16000000 |
205 |
UNRBDA |
Contract for the construction of 1No motorized Borehole in FCT Senitorial District |
Anka Village Abuja municipal area council |
100 |
2020-06-19 16:58:31 |
UNBA-237-S.47-VOLI-1 |
16000000 |
8000000 |
206 |
UNRBDA |
Contract for the construction of 1No motorized Borehole in FCT Senitorial District |
Bwari Village |
100 |
2020-06-19 16:49:54 |
UNBA-237-S.57-VOLI-1 |
16000000 |
8000000 |
207 |
UNRBDA |
Contract for the construction of 1No motorized Borehole in FCT Senitorial District |
Bwari Senator's Wife farm |
100 |
2020-06-19 16:39:20 |
UNBA-237-S.56-VOLI-1 |
16000000 |
8000000 |
208 |
UNRBDA |
Contract for the construction of 1No motorized Borehole in FCT Senitorial District |
Yangoji Primary School |
100 |
2020-06-19 16:32:38 |
UNBA-237-S.62-VOLI-1 |
8000000 |
8000000 |
209 |
UNRBDA |
Construction of 1No. Motorized in FCT Senitorial District |
Kuduku village |
100 |
2020-06-19 14:48:49 |
UNBA-237-S.68-VOLI-1 |
8000000 |
8000000 |
210 |
UNRBDA |
Contract for Construction of motorized Borehole |
Cokuku Junior Sec Sch, Kuje Area Council11 |
100 |
2020-06-18 14:09:50 |
UNBA-237-S.61-VOLI-1 |
15417779 |
7700000 |
211 |
UNRBDA |
Contract for Construction of motorized Borehole |
Adokasa Phase 2 Karu Nasarawa State |
100 |
2020-06-18 13:55:59 |
UNBA-237-S.59-VOLI-1 |
16000000 |
8000000 |
212 |
UNRBDA |
Contract for rehabilitation of Suleja Town hall |
Suleja, Local Govt area Niger State |
100 |
2020-06-18 13:33:14 |
UNBA-237-S.39-VOLI-1 |
10000000 |
10000000 |
213 |
UNRBDA |
Contract for Construction of Central of 3Nos modern Abattoires |
Paiko, Munya & Chanchaga Lga in Niger State |
100 |
2020-06-18 12:55:00 |
UNBA-237-S.48-VOLI-1 |
28688120 |
11000000 |
214 |
UNRBDA |
Contract for remolding of Central Mosque |
Dere, in Niger State |
100 |
2020-06-18 12:42:01 |
UNBA-237-S.45-VOLI-1 |
10000000 |
10000000 |
215 |
UNRBDA |
Contract for the Supply of Tractor to Jega/Aliero/Gwandu Fed. Constituency, Kebbi |
Jega/Aliero/Gwandu Fed. Constituency, Kebbi |
100 |
2020-03-12 18:45:00 |
UNBA-237-S.53-VOLI-1 |
47978000 |
23989000 |
216 |
UNRBDA |
Contract for the drilling of motorized Borehole |
Sheep market Gwagwalada |
100 |
2020-03-12 18:37:40 |
UNBA-237-S.60-VOLI-1 |
16000000 |
8000000 |
217 |
UNRBDA |
Contract for the drilling of motorized Borehole |
Anka Village AMAC |
100 |
2020-03-12 18:23:26 |
UNBA-237-S.58-VOLI-1 |
16000000 |
8000000 |
218 |
UNRBDA |
Contract for the drilling of motorized Borehole |
Kuduku Village |
100 |
2020-03-12 18:19:11 |
UNBA-237-S.68-VOLI-1 |
8000000 |
8000000 |
219 |
UNRBDA |
Contract for the drilling of motorized Borehole |
Bwari Village |
100 |
2020-03-12 18:15:47 |
UNBA-237-S.71-VOLI-1 |
17386000 |
8000000 |
220 |
UNRBDA |
Contract for the drilling of motorized Borehole |
Bwari Wife of Senator Farm |
100 |
2020-03-12 18:13:28 |
UNBA-237-S.56-VOLI-1 |
16000000 |
8000000 |
221 |
UNRBDA |
Contract for the drilling of motorized Borehole |
ORUKPISAKA AREA, ABAJI |
100 |
2020-03-12 17:58:47 |
UNBA-237-S.63-VOLI-1 |
15417779 |
7708889 |
222 |
FMSDIGA |
Contract for the drilling of motorized Borehole |
Isanlu Makutu, Kogi West Sen. District |
100 |
2020-03-02 15:36:45 |
FMSDIGA-PROC-CA-2019-020-VOL1 |
14457975 |
9050493 |
223 |
FMSDIGA |
Contract for the drilling of motorized Borehole |
Igbaruku, Kogi West Sen. District |
100 |
2020-03-02 15:30:34 |
FMSDIGA-PROC-CA-2019-014-VOL1 |
17816084 |
10860592 |
224 |
FMSDIGA |
Contract for the drilling of motorized Borehole |
Odo-Ara, Kogi West Sen. District |
100 |
2020-03-02 15:24:37 |
FMSDIGA-PROC-CA-2019-015-VOL1 |
17637584 |
10860592 |
225 |
FMSDIGA |
Contract for the drilling of motorized Borehole |
Odo-Ere, Kogi West Sen. District |
100 |
2020-03-02 15:19:27 |
FMSDIGA-PROC-CA-2019-017-VOL1 |
17648084 |
10860592 |
226 |
FMSDIGA |
Contract for the drilling of motorized Borehole |
Akatta, Kogi West Sen. District |
100 |
2020-03-02 15:13:26 |
FMSDIGA-PROC-CA-2019-018-VOL1 |
17616584 |
10860592 |
227 |
FMSDIGA |
Contract for the drilling of motorized Borehole |
Egbe no. 2 Okofo (Odo-Ere) , Kogi West Sen. District |
100 |
2020-03-02 15:07:04 |
FMSDIGA-PROC-CA-2019-016-VOL1 |
17627084 |
10860592 |
228 |
FMSDIGA |
Contract for the drilling of motorized Borehole |
Okemeta Isanlu, Kogi West Sen. District |
100 |
2020-03-02 14:17:43 |
FMSDIGA-PROC-CA-2019-019-VOL1 |
13478325 |
9050493 |
229 |
FMSDIGA |
Contract for the drilling of motorized Borehole |
Ijowa Isanlu, Kogi West Sen. District |
100 |
2020-03-02 14:12:47 |
FMSDIGA-PROC-CA-2019-021-VOL1 |
13023360 |
9050493 |
230 |
FMSDIGA |
Contract for the drilling of motorized Borehole |
Fulani Village Imela, Kogi West Sen. District |
100 |
2020-03-02 13:58:21 |
FMSDIGA-PROC-CA-2019-022-VOL1 |
13023360 |
9050493 |
231 |
FMSDIGA |
Contract for the drilling of mot |
Otun Ejuku, Kogi West Senatorial district, |
100 |
2020-03-02 13:03:18 |
FMSDIGA-PROC-CA-2019-023-VOL1 |
13557965 |
9050493 |
232 |
FMSDIGA |
Contract for the drilling of mot |
Oranre, Kogi West Senatorial district |
100 |
2020-03-02 12:51:26 |
FMSDIGA-PROC-CA-2019-024-VOL1 |
14884800 |
9050493 |
233 |
FMSDIGA |
Drilling of Motorized Borehole Isale-Padi Qtrs Aiyewa Kabba |
Isale Padi Quarters Aiyewa Kabba, Kogi west Senatorial Distr |
100 |
2020-03-02 11:21:18 |
FMSD-PROC-CA-2019-004-VOL1 |
10860592 |
10860592 |
234 |
UNRBDA |
Rural water resources scheme |
Abuja South Federal Constituency |
80 |
2020-02-25 11:29:33 |
UNRBDA-236-S.135-VOLI-1 |
4500000 |
4500000 |
235 |
FMSDIGA |
Training and employment of youth and women development in Karu LGA Nasarawa State |
Karu, Nasarawa State |
100 |
2020-02-18 08:41:35 |
FMSDIGA-P and P |
20000000 |
15000000 |
236 |
FMSDIGA |
Drilling of Motorized Borehole |
Army Barracks near Central Mosque, Kogi West |
100 |
2020-02-15 15:44:22 |
FMSDIGA-PROC-CA-2019-008-VOL1 |
17574584 |
10860592 |
237 |
FMSDIGA |
Drilling of Motorized Borehole |
Maigari's Place by Central Mosque, Kogi West |
100 |
2020-02-15 15:35:39 |
FMSDIGA-PROC-CA-2019-010-VOL1 |
17574584 |
10860592 |
238 |
FMSDIGA |
Drilling of Motorized Borehole |
Kabawa, Kogi West |
100 |
2020-02-15 15:16:22 |
FMSDIGA-PROC-CA-2019-012-VOL1 |
17574584 |
10860592 |
239 |
FMSDIGA |
Drilling of motorized borehole |
Jamata near Murtala bridge Lokoja |
100 |
2020-02-15 14:44:39 |
FMSDIGA-PROC-CA-2019-013-VOL1 |
17564084 |
10860592 |